Work of the contract is for construction of the 18th Street Storm Sewer Systems including approximately 16,000 linear feet of storm sewer ranging in size from 24” pipe to a 5’ x 10’ reinforced concrete box, 3,000 feet of water line replacement and 4,500 feet of sanitary sewer line replacement. Also included is resurfacing of the roadway and repair of ADA curb ramps where warranted.
Construction Schedule