Work of the contract is for PROJECT 1 of the 37th Street Paving and Utility Improvements from Broadway to Seawall.
Work of the contract includes;
- 2,860 LF Street repaving (milling and replacement of asphalt surface)
- 12.550 SF Concrete Sidewalk and Ramps
- 3,600 LF Concrete Curb
- 4,200 LF 12" Water Line Improvements
- 1,200 LF 12’’ Sanitary Sewer Line Improvements
- 2.200 LF 18’’-24" Storm RCP
- 2.585 LF Storm Reinf. Conc. Boxes
- 58 Each Storm Inlet Replacement
- 1 Traffic Signal (Design & Construction)