The work covered under this contract includes all components associated with improvements to the Pirates Beach Wastewater Treatment Plant (WWTP) Replacement and Lift Station #35 Replacement and Lift Station #47 Pump Replacement. The work includes, but is not limited to structures, equipment, piping, excavation, grading, and roads.