Applications
Utility Right-of-Way (UROW)
-
Utility R.O.W Applications
Link to page
Application Process:
A Temporary License to Use (TLTU) application may be obtained in the Department of Engineering located at 3015 Market Street or by emailing a completed application and supporting documents to engineering@galvestontx.gov. Submit your completed application at least 72 hours (3 days) in advance of the anticipated date. Please review the application and discuss your project with City Staff to determine actual fees. Please note, partial applications will not be accepted.
Permits are issued for 60 days and may request an extension. The maximum length of a TLTU is 120 days. If a longer period is needed then a permanent LTU must be requested from Planning Division.
A review by Public Works, Engineering, Police Chief, Fire Marshall, Sanitation, and Island Transit is required. A number of considerations are evaluated when city departments review the application and site plan for a Temporary License to Use in the city right-of-way. For example, if a dumpster is too large and will block the alleyway, the Fire Department may have an objection, in which case the TLTU would not be granted. Objections from any of the City Departments will automatically result in denial of the request. Each request is considered on a case-by-case basis.
- Some of our streets are state highways. TXDOT must give approval to block street. These streets are Broadway, Harborside, Ferry Road, FM 3005 (San Luis Pass), 61st Street, Teichman Road between 89th and Broadway and a portion of the Seawall between Broadway and Ferry Road.
- No alcohol on City R.O.W.
- No blow-up amusements allowed on the street. This is for safety reasons for fire and police.
- Blocking of the Strand MUST have signatures of owners affected.
- Seventy-five (75) or more people are considered a "Special Event."
Application Fees:
- Fees are $5.00 per day, $10 application fee, and $45 starting fee for traffic. A $100 charge for Island Transit may be applied if the trolley will be affected by the request.
Should you need further information, please feel free to contact the Department of Engineering at Engineering@GalvestonTX.Gov or call 409-797-3644.
Email road closure forms to publicworks@galvestontx.gov and mbarnett@galvestontx.gov. Any road closure forms associated with a TLTU are required to have an approved TLTU before the road closure is submitted.
Right-of-Way Applications for Driveways, sidewalks, curb and gutters, and culverts can be applied for through Development Services online eportal.
Right-of-Way Construction Application
Galveston, Texas - Code of Ordinances / Chapter 32 - Streets, Sidewalks and Public Places
Sec. 32-10. - Construction, repair, maintenance of streets, sidewalks, curbs, gutters, driveways, culverts
(a) All construction, repair and maintenance of streets, sidewalks, curbs, gutters, driveways, or culverts, or all construction, repair and maintenance in or under streets, sidewalks, curbs, gutters, driveways, or culverts shall be done in conformity with standard specifications on file in the office of the city engineer.
(b) The property owner shall provide pipe and joint sealer to the city for setting driveway culverts. The city shall provide the labor and equipment for setting driveway culverts. The property owner shall pay the city three dollars and fifty cents ($3.50) per linear foot for the city's expense in providing labor and equipment.
How to obtain a Handicap Parking Zone Sign
- The applicant must bring in the Handicap Placard or the vehicle registration showing issued handicap plates for the individual requesting the Handicap Parking Zone.
- A valid Texas Driver's License or Texas I.D. with the address matching the location where the Handicap Parking Zone is to be placed by the City.
- The applicant will need to pay a $50.00 fee for the installation on the zone.
- The installation of the zone should be installed approximately within 5 to 10 business days depending on the weather or other unforeseen reasons.
Street cut forms are required when the street has been cut out for work during construction. Streets Division will oversee the repairs made by the contractors. Contractors shall have an approved Utility Right of Way permit with Engineering prior to start of construction.
Pool permits are issued through Development Services. A review by the Engineering Department for all residential swimming pools is required. Please review the document below which outlines all of the necessary requirements needed from the applicant before engineering review is approved. Additional requirements from Development Services for pool permits shall be directed to planning@galvestontx.gov.
Residential Swimming Pool Requirements
ARTICLE VI. - UTILITY CONSTRUCTION IN PUBLIC RIGHT-OF-WAYS
Sec. 31-281. - Registration and construction permits can be found here Version OptionsApplicationsHeadline
ARTICLE VII. - NETWORK NODES IN PUBLIC RIGHT-OF-WAYS
Sec. 31-302. - Applicable fees and rental rates to the city can be found here Version OptionsApplicationsHeadline